2.2.0 AHP – Scope of Supply.

Filed under: AHP, ash handling plant, thermal power plant — Tags: — shivajichoudhury @ 6:28 am

                    

    The work shall consist of mechanical and electrical work and equipment, all associated structural civil and architectural works, Control and Instrumentation equipment, mechanical services and pipe work and electrical services associated with this ash handling plant, the principal features of this plant being: 

                        (a)        a wet ash extraction and conveying system for ash collected in the boiler furnaces, economiser and air preheater ash hoppers including treatment system of Bottom ash hopper overflow water. 

                        (b)        a dry extraction and conveyance system for the ash collected in electrostatic precipitators collection hoppers and duct hoppers. 

                        (c)        a dry fly transportation and storage system which includes dry ash storage silos. 

                        (d)        combined fly ash and bottom ash slurry disposal system.

                         (e)        ash water supply system.

                         Notwithstanding the scope mentioned for various sub-systems in the following paragraphs, it is the responsibility of the contractor to carry out complete job on turnkey basis and integrate the sub systems with each other.

1.0 Scheme of Ash Handling System:

2.2.1 AHP -Mechanical Equipment

2.2.2 AHP – Electrical Works

2.2.3 AHP :Control and Instrumentation

2.3.0 System Capacity & AHP DESIGN DATA

2.4.0 Site Tests

2.5.Performance and Guarantee Tests (AHP)

2.6.0 Spares(AHP)

2.8.0 Equipment Specification

2.8.2 .Jet Pumps

8.3 Slurry Line Valves

2.8.4. Clinker Grinders

2.8.5 Flushing Apparatus

2.8.6 Expansion Joints for Economiser Hoppers

2.8.7 Expansion Joints for Fly Ash Handling System

1.0 Scheme of Ash Handling System:
2.8.18 Instrument Air Compressors and Dr
2.8.22 Dry Fly Ash Storage Silos
2.8.23 Water and Air Piping, Fitting and
2.8.30 Codes and Standards
2.8.8 Vacuum Pumps for Fly Ash Extractio
2.8.12 Fluidizing Air Blower
2.8.16 Air Compressors for Pneumatic Con
2.8.14 Fittings & PIPES
2.8.5 Flushing Apparatus
2.8.7 Expansion Joints for Fly Ash Handl
2.2.1 AHP -Mechanical Equipment
2.8.27 Horizontal Centrifugal Pump
2.9.0 Inspection and Testing
2.8.15 Surge/ Buffer Hoppers
2.8.25 Ash Slurry Disposal Pipes and Val
8.3 Slurry Line Valves
2.2.3 AHP :Control and Instrumentation
2.8.2 .Jet Pumps
2.8.21 Bag Filters
2.8.4. Clinker Grinders More stats
2.8.6 Expansion Joints for Economiser Ho
2.8.13 Pneumatic Ash Conveying Pipe Line
2.8.17 AHP- Fluidising Air Blowers
2.2.0 AHP – Scope of Supply.
2.6.0 Spares(AHP)
2.3.0 System Capacity & AHP DESIGN D
2.8.9 Fly ash branch feed valves and seg
2.8.27 Horizontal Centrifugal Pumps
2.5.Performance and Guarantee Tests (AHP
2.8.26 Ash Slurry Sump Isolation Plug Va
2.8.0 Equipment Specification
2.2.2 AHP – Electrical Works
2.8.29 Vertical Sump Drainage Pumps
2.8.10 Air Intake Valves
2.8.11 Fluidising Pads/ Air Activated Gr
2.8.24 Water and Air Line Valves and Spe
About
2.8.28 Slurry Disposal Line Valves
2.4.0 Site Tests

Theme: Silver is the New Black. Blog at WordPress.com.

Follow

Get every new post delivered to your Inbox.